In short
- Thanks to its long hours of sunshine, Antalya is one of the provinces in Türkiye with the highest solar energy yield.
- The systems most often chosen for homes are on-grid (self-consumption), hybrid (with battery) and off-grid (battery-backed) systems.
- To sell surplus electricity to the grid, an application for a net metering (unlicensed) system is required; the process takes 8–12 months on average.
- System cost varies with installed capacity (kWp), panel and inverter brand, battery capacity and roof type.
- At Solar Nexo, panels carry a 30-year performance warranty and workmanship a 3-year warranty; the contractual delivery time is 14 working days.
Why is Antalya ideal for solar energy?
Thanks to its Mediterranean climate, Antalya is clear and sunny for most of the year. Long hours of sunshine and high irradiation values mean that a solar energy system of the same size produces more electricity in Antalya than in many other provinces. This shortens the payback period of solar energy investments in Antalya.
The overlap between the hours when air-conditioning demand peaks in summer and the hours of highest solar production makes Antalya particularly advantageous for self-consumption systems.
Types of solar panel systems in Antalya

On-grid (self-consumption): Works connected to the grid, and you use what you produce during the day immediately. It does not provide power during an outage; it is the most economical way to start.
Hybrid (with battery): Uses the grid and a lithium battery together; your critical loads keep running during an outage.
Off-grid (battery-backed): Completely independent of the grid; ideal for places without a grid such as mountain cabins, country houses, farms and boats.
Net metering (with export): Feeds surplus production into the grid and offsets it against your bill. A call letter and project approval are required.
What does the cost of solar energy in Antalya depend on?
The cost of a solar energy system in Antalya varies with the installed capacity required (kWp), the quality of the panels and inverter used, whether there is a battery and its capacity, the roof type and installation difficulty, and the cabling distance. In off-grid systems, lithium batteries make up a significant share (40–50%) of the cost.
It is only right to give you a firm price after an on-site survey and consumption analysis. Solar Nexo carries out the survey free of charge and presents the price transparently, item by item.
The installation process step by step

1. Free survey: We measure your roof and analyse shading and your electricity consumption.
2. Design and simulation: We design the annual production estimate and panel layout through simulation.
3. Contract and procurement: The chosen equipment is procured; the contractual delivery time is 14 working days.
4. Installation and commissioning: Our team usually installs and commissions the system within 3 days.
5. Monitoring and maintenance: You follow your production through the mobile app, and we are by your side with 24/7 technical support.
Which districts of Antalya do we serve?
We carry out solar energy installations in all districts of Antalya, notably Muratpaşa, Kepez, Konyaaltı, Döşemealtı, Aksu, Alanya, Manavgat, Serik, Kemer, Kumluca, Finike, Kaş, Demre, Elmalı, Korkuteli and Gazipaşa, as well as in Burdur, Isparta and Muğla.
How to choose the right solar energy company

When choosing a solar panel company in Antalya, look at completed reference projects, whether it has its own field team, the brand and warranty documents of the equipment used, whether delivery time and warranty terms are written into the contract, and the availability of technical support after installation.
Solar Nexo meets all of these criteria with its own 27-person field team, more than 12 MW installed, a 30-year panel performance warranty and a 24/7 technical support line.





