What is Three-Phase 15 kWe Hybrid Large Package?
Three-Phase 15 kWe Hybrid Large Package is a solar package prepared in the 15 kWe inverter class, operating connected to a three-phase (400 V) grid. The hybrid inverter design lets the system run in parallel with the grid while also allowing a battery to be added. Because the battery model or capacity is not stated in the package name, the storage scope is clarified separately at the quote stage.
Key technical specifications
| Feature | Value |
|---|---|
| Package type | Hybrid solar package |
| Phase | Three-phase |
| Inverter power | 15 kWe |
| Tier | Large |
| Storage | Battery can be added |
Large is the most comprehensive tier of the family; it is intended for projects that want more panel capacity within the same inverter class and have enough roof area. Because total DC panel power and component quantities vary by tier, the exact item list is shared in the quote.
Which projects is it suitable for?
This is a high-capacity package designed for large businesses, production facilities, agricultural operations and commercial buildings with large roof areas. In buildings with a three-phase subscription the loads are distributed evenly across the phases; it provides an infrastructure compatible with three-phase equipment such as motors, air-conditioning groups and pumps.
Use in Antalya and Solar Nexo support
Large roofs that receive high irradiation all year round in Antalya increase the production potential of systems of this scale; in coastal areas, the choice of structure and cabling takes on extra importance because of salt and humidity.
With its Kepez-based team, Solar Nexo manages the process from the site survey to commissioning, from preparing the subscription and grid connection file to technical support; the component list is clearly stated in the quote.
For hybrid installations, the loads to be backed up are also listed, and battery placement and ventilation conditions are planned, so that capacity can be expanded later without problems. Solar Nexo follows the grid application steps.







