Antalya Solar Plant Design: Which Engineering Documents Are Prepared?

The engineering documents behind Antalya solar plant design: site survey and shading analysis, string sizing, single-line diagram, cabling and protection, structural review and PVGIS simulation.

Short answer

Antalya solar plant design consists of an on-site survey, shading analysis, layout plan, string sizing, single-line diagram, cable sizing and voltage drop calculation, protection and earthing design, structural assessment and a PVGIS generation simulation. These documents ensure the plant operates safely and delivers the expected output; check that they exist when comparing quotations.

Key takeaways

  • Engineering design documents the layout, electrical design, protection and expected generation before installation.
  • String sizing must check the inverter limits under both cold-morning and hot-midday conditions.
  • The single-line diagram summarises the plant's electrical structure and is the key reference document for maintenance.
  • Cable cross-sections are calculated for both current-carrying safety and voltage drop losses.
  • A PVGIS simulation is a theoretical estimate; the loss assumption and tilt-orientation data must be stated in the report.

Two quotations can show the same installed capacity, the same panel brand and the same inverter, yet the real difference that determines how the plant will perform over the years is often the project file behind the quote. Antalya solar plant design is the stage at which measurements taken on site turn into calculations, and calculations turn into drawings. A solar power plant (GES, from the Turkish güneş enerji santrali) may seem as though it could be built without these documents; but a wrong string configuration, an undersized cable or missing protection only reveals itself after installation. In this article we explain which engineering documents are prepared, what each one is for and what you should check.

What is Antalya solar plant design, and why does it matter?

Engineering design means putting a plant's layout, electrical design, protection and expected generation on paper before installation. The aim is to answer three questions clearly: where and how will the panels be placed, is the electrical side safe and efficient, and how much will the plant generate per year? These documents give the installation crew a roadmap and, for grid-connected systems, form the technical basis of the application file submitted to the distribution company.

The design usually follows this flow: survey and measurement, design calculations, drawings, simulation and finally installation and acceptance. The output of each step is the input for the next.

Solar Nexo project process1Free survey2Project design3Application4Installation5CommissioningSolar Nexo project process · Solar Nexo

On-site survey and measurement: the project's raw data

Every calculation rests on data collected on site. During the survey, the dimensions, pitch and orientation of the roof or land are measured, and shading sources such as chimneys, air-conditioning outdoor units, railings, trees and neighbouring buildings are noted. The type of roof covering (tiles, sandwich panels, flat terrace), the condition of the supporting structure and the waterproofing are inspected. On the electrical side, the existing distribution board, meter location, subscription details, the space for the inverter and the cable route are identified.

Another input from the survey is consumption data. The last 12 months of bills show how consumption is spread across the year. Is most electricity used during the day or in the evening? Are there loads that must keep running during a power cut? These questions directly affect the size of the plant and the choice between on-grid, hybrid and off-grid. Solar Nexo carries out this survey free of charge and records the measurements, together with photos, in the project file.

Shading analysis and layout plan

Shading is the most insidious source of loss in a solar plant, because shade on a single panel can also drag down the output of the other panels in the same string. Shading analysis takes the sun's path over the whole year into account and examines which obstacle shades which panel in which month and at what time. In winter, with the sun low in the sky, shadows grow longer, so the analysis is especially critical for December and January. For more detail, see our article on how shading affects solar panels.

The layout plan is the drawing that, based on the shading analysis, shows the exact position of the panels on the roof or land. It includes the number of panels, the row arrangement, edge clearances, maintenance walkways, the positions of the structure supports and fire access zones. A good layout plan answers not only the question of how many panels will fit, but also which panels will stay free of shade and how they will be reached for maintenance.

Mounting rails and fixings for solar panels being installed on a villa roof
Rail mounting on a Solar Nexo installation: this is the stage at which the dimensions in the layout plan are applied on site

String sizing and inverter matching

A string is a group of panels connected in series. The purpose of string sizing is to keep the panels' voltage and current values within the inverter's limits. Three checks stand out in this calculation:

  • Cold-morning check: The open-circuit voltage of panels rises in the cold. At the lowest expected temperature, the total string voltage must not exceed the inverter's maximum permitted DC input voltage.
  • Hot-midday check: In summer heat, the operating voltage falls. Under this condition, too, the string voltage must not drop below the inverter's MPPT operating range. Because of the long, hot summers, this check carries particular weight in projects that harness solar energy in Antalya.
  • Current check: The total current of strings connected in parallel must stay within the current limit of the relevant MPPT input.

In addition, panels with different orientations or tilts are not combined in the same string; separate MPPT inputs are used where necessary. The ratio between the total DC power of the panels and the AC power of the inverter is also chosen deliberately. If the ratio is set high, the inverter limits its output during the sunniest hours, which is known as clipping; if it is set low, part of the inverter capacity sits idle. The manufacturers' datasheets for the panels and the inverter are the basis for striking this balance.

Single-line diagram, cable sizing and voltage drop

The single-line diagram summarises the plant's electrical structure in one drawing: starting from the strings, it shows in order the DC fuses and isolators, DC surge protection devices, the inverter, the AC circuit breaker, residual current protection, AC surge protection, the meter and the grid connection point. This diagram is the key document both for the installation crew and for the technician who will carry out maintenance later on; in grid-connected projects it is also part of the application file.

The cable sizing calculation answers two separate questions. The first is safety: the cable must be able to carry its current in the environment where it is laid without overheating. Because high summer temperatures on the roof and cables laid in bundles reduce current-carrying capacity, both are taken into account in the calculation. The second is efficiency: on long runs, voltage drop turns into energy loss. The cross-section is chosen so that it meets the voltage drop limit set in the project criteria. The use of UV-resistant solar cable and mutually compatible connectors on the DC side is also part of this document; for details, see our article on solar cables and connectors.

Protection, earthing and structural assessment

The protection design aims to protect people and equipment in the event of faults and overvoltage. The ratings of fuses and circuit breakers, where surge protection devices will be placed on the DC and AC sides, and the type of residual current protection are defined in this document. The earthing design describes how panel frames, the mounting structure and the inverter housing will be earthed, how equipotential bonding will be done and, if the building already has a lightning protection system, how the plant relates to it. We cover this subject separately in our article on solar plant earthing.

The structural assessment is a document that should not be overlooked, especially for rooftop plants. It evaluates the additional load that panels, mounting structure and ballast place on the roof, the suction effect of wind trying to lift the panels and, in the highland districts, snow load. On old or lightweight roofs, a civil engineer's opinion is obtained where necessary. How the waterproofing will be protected where the roof is penetrated is also settled at this stage. Our article on roof structure and waterproofing can serve as a guide on this topic.

DC cables laid neatly inside a cable tray on a solar energy installation
Cable laying on a Solar Nexo installation: this is how the single-line diagram and cable calculation are applied on site

Generation simulation: PVGIS data for solar energy in Antalya

The simulation estimates how much the plant will generate per year and month by month. PVGIS, the free tool of the European Commission, is often used for this purpose. In a theoretical PVGIS 5.3 calculation, a 1 kWp system at optimum tilt (33°), assuming 14% losses, generates about 1,656 kWh per year in central Antalya. Monthly values are around 99 kWh/kWp in January and December and 168 kWh/kWp in July.

In a project-specific simulation, however, the site's actual tilt, orientation and, where needed, horizon profile are entered instead of the optimum values. On a roof facing east or west, for example, annual generation comes out differently from an optimally oriented system. The simulation report must state clearly which loss assumption was used, because the result changes as that assumption changes. Remember that a simulation is an engineering estimate, not a commitment, and that the actual output of any solar power plant in Antalya can vary from year to year with weather, soiling and temperature; solar energy in Antalya is abundant, but it is never identical from one year to the next.

Antalya solar plant design checklist: what to ask of each document

At the quotation stage or before installation, you can check whether the following documents are included in the file presented to you.

DocumentWhat is it for?What you should check
Survey reportDimensions, shading sources, distribution board and roof conditionDoes it include photos, and does it really belong to your site?
Shading analysis and layout planExact panel positions and the shade-free areaIs the panel count the same as in the quote, and is there maintenance clearance?
String sizingKeeping voltage and current within the inverter limitsHave the cold and hot condition checks been done?
Single-line diagramSummary of the electrical structureAre the DC and AC protection devices shown?
Cable sizing and voltage drop calculationSafety and loss controlAre the cable type and cross-section specified?
Protection and earthing designProtection against faults and overvoltageAre the earthing points and surge protection devices defined?
Structural assessmentWhether the roof can carry the additional loadHave wind and, where relevant, snow loads been considered?
Generation simulationExpected annual and monthly outputAre the loss assumption and tilt-orientation data written down?

Not every small residential system will have all of these documents prepared in the same level of detail; however, string sizing, the single-line diagram and protection information are the minimum requirement for every plant. For the tests and acceptance procedures carried out once installation is complete, continue to our article on the solar plant commissioning and acceptance process.

Conclusion

A sound Antalya solar plant design file ensures that the plant operates safely, delivers the expected output and is easy to maintain in the future. Survey data, shading analysis, string sizing, the single-line diagram, cable and protection calculations, the structural assessment and the PVGIS simulation are complementary pieces of one whole. When comparing quotations for a solar power plant in Antalya, look not only at the panel and inverter brands but also at whether these documents exist and what they contain. Solar Nexo starts the engineering design with a free site survey and shares the documents it prepares with you. For the general framework, you can also read our Antalya solar power plant guide.

Frequently asked questions

Which documents does solar plant engineering design cover?

A solar plant project usually consists of a survey report, shading analysis, layout plan, string sizing, single-line diagram, cable sizing and voltage drop calculation, protection and earthing design, structural assessment and a generation simulation. For small residential systems some documents may be prepared in a simpler form, but string sizing, the single-line diagram and protection information should be present in every project.

Why is string sizing important?

String sizing matters because it keeps the voltage and current of series-connected panels within the inverter's limits. On cold mornings, panel voltage rises and must not exceed the inverter's maximum DC input voltage. At hot midday hours, voltage falls and must not drop below the MPPT range. A faulty calculation can cause the inverter to disconnect, lead to lost generation or result in equipment failure.

What is a single-line diagram?

A single-line diagram is the key document that shows a plant's electrical structure in a single drawing. Strings, DC fuses and isolators, surge protection devices, the inverter, the AC circuit breaker, residual current protection, the meter and the grid connection point appear on it in sequence. The installation crew, the maintenance technician and, in grid-connected projects, the distribution company all refer to this document, so it must be kept up to date.

What happens if panels are placed without a shading analysis?

Without a shading analysis, some panels may sit in shade during certain months and hours of the year, which can also reduce the output of the other panels in the same string. In winter especially, with the sun low, shadows from chimneys, railings and trees grow longer. The problem is usually noticed only after installation, when the expected output fails to materialise; fixing it at that stage may mean changing the layout.

Is the figure in the generation simulation guaranteed?

No, a generation simulation is an engineering estimate, not a guarantee. Tools such as PVGIS rely on long-term climate data and loss assumptions; the theoretical value for central Antalya is 1,656 kWh/kWp per year. Actual output varies from year to year with weather, soiling, temperature, shading and equipment performance. The report must clearly state the loss assumption used, as well as the tilt and orientation data.

Is a structural calculation needed before installing a solar plant on a roof?

Whether the roof can safely carry the additional load must always be assessed. Panels, mounting structure and any ballast add weight to the roof; the suction effect of wind and, in highland areas, snow load are also taken into account. For old, lightweight or damaged roofs, obtaining a civil engineer's opinion is recommended. How the waterproofing will be preserved at the fixing points should also be decided at this stage.

Sources

  1. PVGIS – European Commission JRC
  2. Akdeniz EDAŞ
  3. Energy Market Regulatory Authority (EPDK)

Want a clear calculation for your roof?

The Solar Nexo team carries out a free site survey at your address in Antalya and designs the system that suits your roof, consumption and budget.

Read these next

Related articles

Antalya Solar Energy Systems

We are opening the doors of the future with solar energy

Call now or fill in the form for detailed information and a free site survey; we come to every corner of Antalya.

+90 540 007 63 96